Yeah, traded some stuff to a guy for that. Holds 660 cans.

I currently have it loaded with different soda, water, tea, and beer.

Just need to get the password (which is by region, apparently) so I can change pricing on it and not have to stick $1.50 in it every time I want a beer. :lol:
 
It keeps everything nice and chilled...and it helps when he leaves it unlocked :D

I can't wait for your next GTG, Jason.
 
Nice shop.

That third gen will need subframe connectors if you put anything more than stock power in it. A 375hp 327 twisted my 82 berlinetta...
 
Really nice setup, Jason!


It looks like you're really close to being 100% up and running. :) I know the feeling of not being able to start the project that you really want or need to start until you get everything else in order. :/ But you'll get there, you're super close!


One thing that I did to make my workshop a much happier place to be was to put the compressor and dust collection vac outside of my actual enclosed work area just for the noise factor.


Now I can hear myself think again, and the actual tool noise is more satisfying, LOL.

And sometimes you rely on the sound of the tool or its interaction with the workpiece to know when something is going right or wrong.


Having the compressor, dust vac, AND an actual tool running all at the same time was a bit overbearing in my small-ish workshop (though its just an 8x8x20 built-out shipping container, so much more reverberant)!


Subscribed and looking forward to seeing your projects!

.
 
It's taken a lot to get to this point. Much of it standing or sitting and looking at the space and figuring out how - exactly - I want the place laid out and making it all work together. Then there's the whole "build a shop without a shop" scenario. Every time you cut wood or sand drywall mud it makes a complete mess out of everything.

I put the table saw in place, knew where I wanted the router (same basic locations I've used setting up car audio shops) and knew where the compressor, dust collector, and lathe were going.

I got everything in rough place and started pluming all of the dust collection. I wanted to have the piping along one wall but allowed myself a location to run wye across the shop to the opposite wall if I wanted/needed in the future. Running piping along that wall meant I needed to adjust placement of the table saw, router, lathe, and air compressor to get it all to work the way I wanted and allow for an outfeed/wood storage/downdraft table. I'm hashing out the plan for that table in my head and making revisions.


At this point I need to build some retainers/supports for some of the dust collection piping that will go below the blast gates. The SawStop over arm dust collection hood wants to rotate the 4" pipe. A simple brace will keep it in place. Once those are in I can focus on the outfeed/storage/sanding table.

This is how it looked on the 20th. I've since built the riser for the support legs of the table saw.
View attachment 8986

View attachment 8987

And , after looking back through the image folder, here are a couple of photos from May 7th. Before I started framing it all in.

View attachment 8988View attachment 8989

Framing started on May 20th.
View attachment 8990
 
That’s one very nice garage you have there. Something with a garage like that in my area would probably sell for 700K and up. Just so you know, Porter Cable sells vacuum attachments for dustless drywall sanding. You can also use zip wall poles and plastic to quarantine off the dust. Our carpenters at work use negative air machines with zip wall and plastic when they work in hospitals To keep the dust from escaping the work area.
 
Looks awesome!!

Thanks!

That’s one very nice garage you have there. Something with a garage like that in my area would probably sell for 700K and up. Just so you know, Porter Cable sells vacuum attachments for dustless drywall sanding. You can also use zip wall poles and plastic to quarantine off the dust. Our carpenters at work use negative air machines with zip wall and plastic when they work in hospitals To keep the dust from escaping the work area.

The garage was a nice feature, and things are cheaper here in the South.

I'll do so little drywall I'm not sure it's worth buying. Fortunately I'm pretty much to the point that it's all finish mud and sanding.

The biggest issue is getting dust collection wrapped up. Problem is that I have tech info to do for the video and it takes time.

I'm still moving stuff from one area to another to get work done. Same old thing, too. Move stuff out of the way so I can work in an area.

We moved into the house in March of last year. If I can have it wrapped up March of this year I'll be happy.
 